GLOBAL-EVENT-MONTREAL
Evening access through C2 ends earlier
For evening operations on September 7 and 8, 2077, covered passage C2 opens at 18:00 UTC but closes at 00:00 UTC the following day, rather than 03:00. The scope is the C2 link between the cultural workshop and residential connector, not the opening hours of either building. Include the calendar date in personal plans because the 00:00 cutoff crosses a UTC date boundary.
E1 remains available from 18:00 to 03:00 UTC the next day; it is about 420 m longer than C2 and passes through two additional doors. Check E1’s lift guidance when continuous access is needed. Equipment carriers should not assume receiving desks are open simply because the passage is open. Performance and workshop booking times remain unchanged. The next passage review is September 8 at 20:00 UTC.