GLOBAL-EVENT-NAIROBI
Public E3 ledger updates pause during meter inspection
On September 7, 2077, the E3 cooperative’s meter-information desk changes from continuous updates at 08:00–16:00 UTC to two windows, 08:00–10:00 and 13:00–16:00. Meter revisions are checked against ledger entries during the gap; readings remain blank rather than being counted as zero use. The scope is E3’s public metering record, not E1/E2 data or power to common rooms.
An edition released before 10:00 UTC can be retained as a pre-inspection record but cannot finalize that day’s usage charge. Continue a comparison with the completed daily record for September 6, or wait for the revision after 13:00 UTC on September 7. Keep any estimate of the gap separate from verified readings. Resumption is reviewed at 13:30 UTC.
Do not finalize shared monthly costs from the September 7 E3 readings.
JobsMeter-information handovers must distinguish pre- and post-inspection editions.
programsLedger-reading activities may use the completed September 6 record.
ShopKeep receipt records for E3 label kits separate from replacement meters.