GLOBAL-EVENT-ROTTERDAM
Recovered materials move from Q2 to Q4 receiving
From 06:00 UTC on September 7 to 18:00 UTC on September 8, 2077, removable floor panels are replaced on quay Q2’s material-return route. Its normal 06:00–16:00 receiving window is suspended; Q4 receives instead at 07:00–14:00 UTC. The affected area is the Q2 return route and waiting bay, not the entire waterfront pedestrian passage.
Q4’s general waiting bay accepts bundles no longer than 1.2 m. Longer panels require separate space and unloading confirmation at Q4-L, or a schedule made after checking Q2’s reopening notice from 06:00 UTC on September 9. A booking number does not override the new location’s length limit; material history continues under the same bundle identifier. The next review is September 8 at 16:00 UTC.