United States · USDDistrict notices · 30SCENARIO MODE · 2077
Language

LOCAL CONDITIONS

Two lunar common rooms extend preparation between sessions

On September 7–9, Shackleton S4 and Amundsen A2 extend preparation from 20 to 40 minutes. Each facility has its own next session.

SCENARIO MODE · 2077
2077.09.08 · scenario conditions

Shackleton · Indoor climate stable

Vacuum outside. The chart shows indoor module temperatures. Water-cycle maintenance notices apply.

Exterior surface · -173°C

Scheduled indoor setpoints · Base UTC

Water Cycle Information Desk · View on map

12:0021°CIndoor setting
15:0021°CIndoor setting
18:0020°CIndoor setting
21:0020°CIndoor setting
Shackleton Research & Industry Zone · Current indoor reading20°C
Gravity0.165 g
Relay delay from Earth1.3s
Local conditions dataScenario observations

Connected everyday stories

GLOBAL-EVENT-SHACKLETON

Two lunar common rooms extend preparation between sessions

From 08:00 UTC on September 7 through 18:00 UTC on September 9, 2077, preparation between sessions grows from 20 to 40 minutes at Shackleton workshop S4 and Amundsen reading room A2. After S4’s 10:00–11:00 use, the next start moves from 11:20 to 11:40; after A2’s 13:00–14:00 use, it moves from 14:20 to 14:40. This covers equipment-state checks and layout restoration, not private-home air or lighting settings.

For an earlier option, S4 users may compare S1 reference-reading seats in their own settlement, while A2 users may compare A1 reading seats. Neither alternative accepts tool work, so the activity cannot be transferred merely because a seat is available. No immediate transfer between Shackleton and Amundsen is proposed; existing bookings require separate confirmation with the chosen facility. Preparation time is reviewed on September 8 at 15:00 UTC.

G (geomagnetic storms), S (solar radiation storms), and R (radio blackouts) are different Earth space-weather scales. This page does not assess personal risk on the Moon or Mars. NOAA scale references