Share of thirty-seven pouch repairs handed over on the promised civic day89.2%
Week on week+1.7 ppHigher
2077-06-23 – 2077-09-08
- Selected range change
- +19.6 ppHigher
- Range low
- 69.58
- Range high
- 89.2
Data table & CSV download 12 weekly observations
Download CSV| Recorded | Value (%) | Previous week |
|---|---|---|
| 2077-09-08 | 89.2 | +1.7 ppHigher |
| 2077-09-01 | 87.51 | +1.8 ppHigher |
| 2077-08-25 | 85.7 | +5.4 ppHigher |
| 2077-08-18 | 80.29 | -3.5 ppLower |
| 2077-08-11 | 83.79 | +4.5 ppHigher |
| 2077-08-04 | 79.3 | -1.8 ppLower |
| 2077-07-28 | 81.1 | +7.1 ppHigher |
| 2077-07-21 | 74.03 | -3.6 ppLower |
| 2077-07-14 | 77.66 | +7.1 ppHigher |
| 2077-07-07 | 70.56 | -2.6 ppLower |
| 2077-06-30 | 73.21 | +3.6 ppHigher |
| 2077-06-23 | 69.58 | No earlier record |
What changed this week
Share of thirty-seven pouch repairs handed over on the promised civic day
Twelve authored observations through 8 September 2077. A faulty mesh seam creates small-part resorting and a second handover cost. Values between observation dates are not assumed measured. Next review is 15 September 2077 using the same sample basis.
Check actual tool dimensions, trial the waist band and short tether with unloaded tools, and explain the detachable-pocket handover.
How to read this number
It counts repair handovers, not proof that no parts were lost.