Median intake-to-inspected-handover hours for 38 swivel-inclusive repairs6.6hours
Week on week+0.2 hoursHigher
2077-06-23 – 2077-09-08
- Selected range change
- +1.4 hoursHigher
- Range low
- 5.12
- Range high
- 6.6
Data table & CSV download 12 weekly observations
Download CSV| Recorded | Value (hours) | Previous week |
|---|---|---|
| 2077-09-08 | 6.6 | +0.2 hoursHigher |
| 2077-09-01 | 6.38 | +0.1 hoursHigher |
| 2077-08-25 | 6.26 | +0.3 hoursHigher |
| 2077-08-18 | 5.93 | -0.3 hoursLower |
| 2077-08-11 | 6.26 | +0.3 hoursHigher |
| 2077-08-04 | 5.96 | -0.1 hoursLower |
| 2077-07-28 | 6.07 | +0.6 hoursHigher |
| 2077-07-21 | 5.48 | -0.2 hoursLower |
| 2077-07-14 | 5.68 | +0.6 hoursHigher |
| 2077-07-07 | 5.12 | -0.2 hoursLower |
| 2077-06-30 | 5.35 | +0.2 hoursHigher |
| 2077-06-23 | 5.15 | No earlier record |
What changed this week
Median intake-to-inspected-handover hours for 38 swivel-inclusive repairs
Twelve authored observations through 8 September 2077. A surge in apprentice inspection work can exceed the available mentor-review time. Values between observation dates are not assumed measured. Next review is 15 September 2077 using the same sample basis.
Test cord abrasion and the swivel with an unloaded tool, then have a mentor review its bench-width length chart.
How to read this number
Turnaround informs bench availability, not surface-work safety performance.