Frames passing both clip checks among 62 assembled dollies75%
Week on week+0.6 ppHigher
2077-06-23 – 2077-09-08
- Selected range change
- +4.8 ppHigher
- Range low
- 70.2
- Range high
- 75
Data table & CSV download 12 weekly observations
Download CSV| Recorded | Value (%) | Previous week |
|---|---|---|
| 2077-09-08 | 75 | +0.6 ppHigher |
| 2077-09-01 | 74.4 | +1.2 ppHigher |
| 2077-08-25 | 73.2 | -0.6 ppLower |
| 2077-08-18 | 73.8 | +0.6 ppHigher |
| 2077-08-11 | 73.2 | +1.2 ppHigher |
| 2077-08-04 | 72 | -0.6 ppLower |
| 2077-07-28 | 72.6 | +0.6 ppHigher |
| 2077-07-21 | 72 | +1.2 ppHigher |
| 2077-07-14 | 70.8 | -0.6 ppLower |
| 2077-07-07 | 71.4 | +0.6 ppHigher |
| 2077-06-30 | 70.8 | +0.6 ppHigher |
| 2077-06-23 | 70.2 | No earlier record |
What changed this week
Crate-dolly clip inspection yield · 2077-09-01 74.4 / 2077-09-08 75 (percent)
Frames passing both clip checks among 62 assembled dollies
Passed clip inspections do not count loaded journeys.
How to read this number
The yield describes assembly checks rather than transport safety in every setting.