Six recovered panels waiting at Q4-L
Six 1.8 m panels and 12 edge protectors have reached Q4-L, a separate bundle exceeding the general Q4 bay’s 1.2 m limit.
Recovered bundle RP-6, recorded at 12:10 UTC on September 7, 2077, contains six 1.8 m panels, 12 edge protectors, and six condition sheets. With Q2 temporarily closed, it was moved to long-item acceptance area Q4-L rather than the general Q4 bay. Five panels match their sheets; one has an unrecorded scratch, so its condition grade remains unconfirmed.
The next handover requires the receiving maker to compare each condition sheet during 12:30–13:00 UTC. The six panels need not be accepted as one uniformly priced lot; the unconfirmed panel may be reviewed separately or retained under an agreed storage extension. This record covers return from waterfront storage to a worker’s acceptance point, not installation approval or panel certification.
Completed
Recovered bundle RP-6 listed
08:20 UTC · Individual condition sheets were linked to six panels and 12 protectors were counted.
Completed
Acceptance moved from Q2 to Q4-L
10:30 UTC · The 1.8 m length excluded the general Q4 bay; the bundle was placed at Q4-L.
- 3
In progress
One panel’s condition being rechecked
12:10 UTC · One scratch absent from the condition sheet was recorded. That panel’s grade has not been accepted.
- 4
Scheduled
Acceptance after individual-sheet review
Each of six sheets must be checked during 12:30–13:00 UTC. The unconfirmed panel requires a separate acceptance or storage agreement.